ABRACADABRA

Ker 43

For the Admiral’s Cup campaign, GPR provided engineering consultation, structural modifications, and race-period support for Abracadabra.


When time-sensitive challenges arose—including late component deliveries and damaged hardware—GPR deployed rapid logistics, transporting equipment from the U.S. to the U.K. to maintain competition schedules.


The result was a technically optimized, race-ready platform that competed at both the Admiral’s Cup and ORC Worlds.

Services Provided:

Rigging and spar redesign

Electric winch system integration and testing

Hull refinishing and fairing to racing specifications

Emergency composite and rigging repairs

Logistics coordination across suppliers in the U.S. and Europe

On-site systems optimization during regatta